1

The Penmann team finalises comprehensive HVAC refurbishment for Nutricia’s Liverpool site in line with FSI Phase 1 and 2

News Discuss 
Penmann has completed a complex HVAC upgrade at Danone Nutricia's Liverpool-based production site, supplying a fully engineered ventilation and climate control system engineered to meet strict hygiene and production standards. The scope included the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High https://socialbuzzfeed.com/story6175340/the-penmann-team-delivers-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story